Improve Internal Drains: Implementation

When we engaged with the Ward Officer, he was working on the internal drain improvement within the ward with the support of the community. Therefore, we worked with him as follows:

  • develop the technical design to include the trapezium drains as shown in the technical design part.
  • discuss and improve this design and the implementation with the Ward Officer
  • support the Ward Officer financially for one specific drain stretches that he already prioritized and started working on, in the ‘traditional way’ (dark green area near Monastery in the figure)
  • work with the Ward Officer on another stretch to build a trapezium shaped drain; we chose the drain section which connects Theingi Street to Zingama Road (Red area in Figure x). The total length is about 160 m for this sector.
  • discuss and support monitoring and evaluation of the design
Improve Internal Drains- Implementation
Figure: Drainage work area location

Drainage cost breakdown

The cost breakdown for the drain near the Monastery (Dark green area in the above figure) and the drain sector connecting Theingi Street to Zingama Road (Red area in the above figure) are shown in this section. The cost estimates are done in 2020, before construction.

improve internal drains_implementation1
Table: The cost breakdown at monastery by kyats (Myanmar Currency).
improve internal drains_implementation2
Table: The cost breakdown at Zingama by kyats (Myanmar Currency)
[miniorange_social_sharing]

Latest Resources

Explore project resources

Insights into our purpose, values, and background

Personalized support tailored to your requirements

Collaborate and grow with us through strategic partnerships